A window allows visitors to watch the trains running in the tunnel. Its purpose was to test the infrastructure and any ancillary systems.On 31 October 2014, the railway track installation was completed.

The length of the meile in use in that part of Switzerland (approx. After 17 years of construction with the help of more than 2600 workers on 1st June 2016 the new high-speed railway tunnel was opened – the new Gotthard Rail Link or Gotthard Base Tunnel.

The Gotthard Base Tunnel, with a length of 57.09 kilometres (35.47 mi) and a total of 151.84 km (94.3 mi) of tunnels, shafts and passages, is the longest railway tunnel in the world, with a geodetic distance of 55.782 kilometres (34.661 mi) between the two portals. For the 2016 rail tunnel, see Length was first published by the operators of the tunnel, Gotthardbahn, in 1882 when the tunnel opened.

On 8 November, a train reached the top speed of 275 km/h.Nine workers lost their lives during construction; one in the Amsteg section, two in the Sedrun section, and three each in the southernmost Faido and Bodio sections.In 2016, several events, including festivities and special exhibitions, were held around the Gotthard, culminating in the inaugurations in early June, dubbed On 31 May 2016, a day before the inauguration, the nine people who died during construction were commemorated in a ceremony at the north portal in The tunnel was officially inaugurated on 1 June 2016.From the Amsteg portal, guided tours are organised inside the Gotthard Base Tunnel complex. All three tunnels bypass the Gotthard Pass, an important trade route since the 13th century. It is a wholly owned subsidiary of the To cut construction time in half, four access tunnels were built so that construction could start at four different sites simultaneously: Erstfeld, Amsteg, Sedrun, and Faido. The main purpose of the Gotthard Base Tunnel is to increase local transport capacity through the Alpine barrier, especially for freight, notably on the After 64 percent of Swiss voters accepted the NRLA project in The Gotthard Base Tunnel, with a length of 57.09 kilometres (35.47 mi) and a total of 151.84 km (94.3 mi) of tunnels, shafts and passages, is the Like the two other tunnels passing below the Gotthard, the Gotthard Base Tunnel connects two Alpine valleys across the The north portal lies in the north of the municipality of Erstfeld, north portal, 460 metres (1,510 ft) a.s.l.

A second law, the The goal of both the laws is to transport trucks, trailers and freight containers through Switzerland, from Passenger trains can travel up to 250 km/h (155 mph) through the GBT, currently reducing travel times for trans-Alpine train journeys by about 40 minutes, and by one hour once the adjacent AlpTransit Gotthard AG was responsible for construction.

From 1924, car transport on trains through the railway tunnel began. For other, see The north and south portals on the same spring day. Train services from Italy to Switzerland through the line are expected to become faster from 2020, with the opening of the 67,000 tons on 120 trains passed through the tunnel each day during the first half year of operation.This article is about the 2016 railway tunnel. The tunnel rises from the northern portal at Göschenen (1,106 m (3,629 ft)) and the highest point (1,151 m (3,776 ft)) is reached after approximately 8 kilometres (5.0 mi). Start of the new 7 km long open-air section from Giustizia to the south portal THE GOTTHARD ROUTE IS PART OF THE INTERNATIONAL NORTH-SOUTH ALPINE TRANSVERSAL. Faido portal (maintenance access), 757 metres (2,484 ft) a.s.l. It is also the first flat route through the Alps or any other major mountain range, with a maximum height of 549 metres (1,801 ft) above sea level, corresponding to that of Bern. It was stated as "... tunnellänge ist ungefähr 3 1⁄8 meile."

It connects Göschenen with Airolo and was the first tunnel through the Saint-Gotthard Massif in order to bypass the St Gotthard Pass. Biasca, south portal, 312 metres (1,024 ft) a.s.l. But as the original measurement is approximate, so is the conversion. After two more kilometers, the border between the The tunnel was built from 1871 to 1881 and marked the first large-scale use of A memorial for the dead workers was erected in 1932 near the station building at Airolo. IT MARKS ONE OF THE MOST IMPORTANT HIGH-PROFILE AMBERG HAS BEEN INVOLVED IN RECENT YEARS.

It is built as one double-track, standard gauge tunnel. Sedrun portal (maintenance access, bridge over the Anterior Rhine), 1,334 metres (4,377 ft) a.s.l. The safety requirements on the rolling stock will be similar to those of other long Swiss tunnels, including the ability for the Since the opening date on June 1, 2016, between 130 and 160 trains on an average working day operated through the Gotthard Base Tunnel, which in March 2019 marked the 100,000th transit.

(en: ... tunnel length is approximately 3 1/8 miles).

Trains can move between the tunnels in the two multifunction stations at Access to the Sedrun station site is by a level access tunnel 1 km (0.6 mi) long from the valley floor near Sedrun. At the end of the access tunnel, two vertical shafts lead 800 m (2,625 ft) down to the base tunnel level. The Gotthard Road Tunnel is one of the three tunnels that connect the Swiss Plateau to southern Switzerland and run under the Gotthard Massif, the two other being railway tunnels, the Gotthard Tunnel (1882) and the Gotthard Base Tunnel (2016). 4800 metres) means that the length converts to 15 kilometres.